Notice: In order to edit this ticket you need to be either: a Product Owner, The owner or the reporter of the ticket, or, in case of a Task not yet assigned, a team_member"

Bug #906 (new)

Opened 10 years ago

Last modified 9 years ago

Changing a ticket type can lead to invalid links

Reported by: fschwarz Owned by:
Milestone: n.a. Sprint: n.a.
Impact: Minimal Complexity: n.a.
Total Remaining Time: n.a.

Description

I have story with tasks and when I change the type of the story to something else (e.g. task, requirement), the new ticket still has children even though the link configuration does not allow this kind of links.

Change History (1)

comment:1 Changed 9 years ago by fschwarz

  • Impact set to Minimal
Note: See TracTickets for help on using tickets. You may also have a look at Agilo extensions to the ticket.

1.3.15 © 2008-2016 Agilo Software all rights reserved (this page was served in: 0.192992 sec.)